Tuesday, November 29, 2022

EDITOR PICKS

TCN adds 98MW to grid; energizes 2x60mva 132/33kv Gwarinpa Sub-station

According to a statement, the 132kV transmission sub-station is one of the five sub-station projects comprising the Abuja Ring Projects, funded by Agence Francais de Developpment (AFD).

NDPHC wins Power project of the year award

The Power Sector Awards is an initiative designed to recognize, celebrate and promote public and private sector organizations and individuals in the Nigerian Electricity Supply Industry (NESI).  

TCN delivers 22 Power Transformers, other Transmission Equipment to Lagos store

The equipment described as the highest of such in the company’s history, comprise of 22 power transformers, haulage trucks, transmission switchyard spare parts, 45No. earthing transformers, Suspension Clamps, Vibration Dampers, Armor Rods, Circuit Breakers, Current transformer, Voltage transformers, 100tons Crane truck heads

POPULAR POSTS

TCN adds 98MW to grid; energizes 2x60mva 132/33kv Gwarinpa Sub-station

According to a statement, the 132kV transmission sub-station is one of the five sub-station projects comprising the Abuja Ring Projects, funded by Agence Francais de Developpment (AFD).

NDPHC wins Power project of the year award

The Power Sector Awards is an initiative designed to recognize, celebrate and promote public and private sector organizations and individuals in the Nigerian Electricity Supply Industry (NESI).  

TCN delivers 22 Power Transformers, other Transmission Equipment to Lagos store

The equipment described as the highest of such in the company’s history, comprise of 22 power transformers, haulage trucks, transmission switchyard spare parts, 45No. earthing transformers, Suspension Clamps, Vibration Dampers, Armor Rods, Circuit Breakers, Current transformer, Voltage transformers, 100tons Crane truck heads

© EnergyTimes online developed by Kreateng