According to Mahmud, Mojec’s various initiatives and pioneering of Smart Meters in the country have contributed in no small measure in addressing the major complaints that the regulatory body has been contending with.
Project Manager, MOJEC International Limited, Engineer Lekan Bashiru, indicated that extending the Mobile MAP activation to Ibeju-Lekki was a result of the company's determination to address the country's metering gap, which was quickly becoming a bane of both the DisCos and their customers.
The company averred that it fully discharged its obligations of manufacturing, supplies, and installation of meters for all eight DisCos, underpinning the success of the NMMP nationwide.
Sylva’s resignation comes at a time of political transition in Nigeria, with President Muhammadu Buhari serving his final weeks in office before giving way to President-elect Bola Tinubu on May 29.
It said: “We are pleased to announce the successful restoration of ST-6 after extensive repairs, including replacement of HIP & LP steam turbine blades and Generator overhauling, in addition to the in-house inspections for Boiler and Balance of Plant.
The conglomerate saw a 7% increase in its Power investments, despite the challenges faced in the year from the issues with gas supply, off the diminished Oil & Gas production in the country in 2022.